• T: +44 (0) 1274 684004

Brownhill Surgery - Refurbishment

Brownhill Surgery - Refurbishment

​Brownhill Surgery

5 Days to Complete​

Before:

  • A workspace solution was required
  • More storage was required to remove clutter
  • The flooring was non-compliant
  • Sinks and Taps did not meet current legislation

After:

  • The customer chose new Beech effect base and wall units combined with a dark grey worktop
  • A full height splash back was installed above the whole worktop and sealed at the top and bottom
  • The existing fridge was allowed for
  • HTM64 sinks and taps were fitted
  • A new desk area was designed and fitted
  • Sunflower Vista high level modules with optional wheels were incorporated, allowing them to be moved forward for cleaning

​Many Sunflower Medical Products are on Contract with NHS Supply Chain on:

Contract No: FAG: 15887 OJEU 2014/S 198-349358

Contracted to NHS Shared Business Services for the supply of Medical Furniture:

Contract No: SBS/16/SB/TPB/9050/12 OJEU 2016/S 174-312172


​​http://www.supplychain.nhs.uk/portal/page/portal/P...

Get in touch now for a brochure or to discuss our products and services.

Brownhill Surgery - Refurbishment second
Latest Case Studies

Yorkshire Hair Replacement Centre

Read Article
Learn More

You currently have JavaScript disabled!

This site requires JavaScript to be enabled. Some functions of the site may not be usable or the site may not look correct until you enable JavaScript. You can enable JavaScript by following this tutorial. Once JavaScript is enabled, this message will be removed.

You are using an old browser. Please update your browser to benefit from the latest technology and security updates. This website may not display correctly if you do not update your browser.